Sera C.R. E. No. 24.
Kowloon Canton Railway.
BRITISH SECTION ESTIMATE.
Main Head Bridges
Sub. Head Major No.7.
Work One 60' Span T.Girder Chain 11:691
Drawing C.P.5. Mo.1291.
AMOUNT.
Quantity DESCRIPTION Rate Unit $ Cts. 060 0 Excavation in found. 10/- 60 00 Timbering and Puying. 500 00 17300 Concrete in found. 35/- cu. ft. 6055 00 4250 Masonry in Footings. 40/- 1700 00 23050 Superstructure. 40/- 9230 00 331 Coping and Bed Stones. 2/0 662 00 2000 Dry Stones behind Abuts. 10/- 201 00 1 60' Girder Span landed in Kowloon. 5500 00 1 60' Carriage to site and Erection. 500 00 Total 24717 00 Contingencies 10% 2471 70 Grand Total 27168 7018
.BWlisЯ notne noolwo
ZOITOB2 MZITISIA
.3TAMI723
JJ
2011: Je tu
82
Sera C.R. E. No. 24.
Kowloon Canton
Railway.
BRITISH SECTION
ESTIMATE.
bask nielt
best du
Main Head
Bridges
Sub. Head Major No.7.
Work One 60' Span T.Girder Chain 11:691
Drawing C.P.5. Mo.1291.
AMOUNT.
¡Quantity.
DESCRIPTION.
Rate. Unit.
$
Cts.
060 0
Excavation in found..
10/-
560 00.
Item.
Timbering and Puying.
i
500
#7300
Concrete in found».
35/-
6055
on.
4250
Masonry in Footings.
40/-
1700 00.
13050
Superstructure.
40/-
923000.
3.51
Cuping and Bad Stones.
2/ 0.
662
Co.
2000
Dry Stones behind Abuts.
10/-
201
1
60° Girder Span landad in Kowloon.
5500
00.
༴ ིི ིདོ་
1
60' Carráce to site and Bruction.
500
00.
IntoT
Total
24717
00.
Contingincies 10%
Grand Total
71
70.
$27168 70.